Oil & gas industry
VALHAL - instalation of water unit on existing drilling rig
Structural analysis and design of 6 skids to be mounted on Valhal drilling rig. Analysis of lifting possibili
Troll B platform. Modernization of Sea Water unit.
Sea Water unit has been delivered, lifted and placed in its destination place.